11-22-2005 More Bathroom

Four Layer R-12 Insualtion In the Dropped Ceiling
Exhaust Light Heater Installed
Plumbing Joints now all Fluxed and soldered together
Patched some holes in the bedroom walls and taped and sanded some cracks

CLICK A PIC TO ENLARGE

DSCF0008.JPG DSCF0009.JPG DSCF0010.JPG DSCF0011.JPG DSCF0012.JPG
DSCF0013.JPG DSCF0014.JPG DSCF0015.JPG DSCF0016.JPG